Mission Control 24x7·Seven readiness gates per rack
Operational excellence, from factory to production
Secure by design, resilient by architecture, operated with accountability. Every rack passes seven documented gates before your first workload runs, and one team owns the operation after that: monitoring, incidents, changes, and recovery, 24x7.
OEM engineers may need temporary diagnostic access during installation. CambridgeNexus closes that access, rotates every credential and validates every GPU before a rack or system is handed to you. OEM ready, customer ready and production ready are three different states, and each one is evidenced before the next begins.
The main metric we monitor is “time to productive compute,” the sooner you can trust the system with real work the better. Every gate below has a named owner. The same seven gates apply to NVIDIA GB300 NVL72 racks and to NVIDIA B300 systems; B300 is air-cooled, with no liquid cooling, so it is simpler to install and operate. Vera Rubin racks will follow the same 7-gate framework when they ship. See the seven operating layers behind it
OEM validation, BOM and serial verification, firmware baseline, factory diagnostics.
Power, and space confirmed. Liquid cooling and CDU checked. Network fabric and rack position set.
72-GPU health check, NVLink and NVSwitch verification, InfiniBand or RoCE fabric, NIC, storage and burn-in.
North-south IP and routes, fabric validation, storage array network, customer connectivity.
Credentials rotated, PAM and MFA active, SSH hardened, security telemetry live.
Functional validation, exceptions documented, technical and PMO sign-off.
Monitoring active, SLA activated, Mission Control live, operational ownership transferred.
The CambridgeNexus Delivery Passport is the authoritative record for each rack, from serial number to customer sign-off.
Rack ID and asset IDs, serial numbers, OEM configuration, customer assignment.
GPU and CPU health, firmware versions, burn-in results, fabric validation.
Credential rotation, hardening status, vulnerability validation, privileged-access status.
Sign-offs from CambridgeNexus engineering, security and operations, and from your technical lead and PMO.
Zero-trust access is built into the architecture. No unmanaged privileged access: every session is identity-verified, purpose-authorized, time-limited and fully auditable.
Four severity levels, each with a named lead and a communication cadence. Response times and service levels are set in your contract.
| Severity | Owner | Example impact | Communication cadence |
|---|---|---|---|
| SEV-1 Critical | Incident Commander | Production unavailable, major security event | Continuous updates until service is restored |
| SEV-2 High | Operations Lead | Material degradation or loss of redundancy | Frequent updates until resolved |
| SEV-3 Medium | Support Engineering | Limited or non-critical impairment | Regular updates |
| SEV-4 Request | Service Desk | Information, change or service request | Standard service desk workflow |
Telemetry identifies the disruption and triggers classification.
Severity set, incident command activated.
Customers and unaffected infrastructure protected first.
Infrastructure and services restored per contracted scope.
Technical and security validation before release.
Customer production formally restored and confirmed.
Root cause analysis and corrective actions documented and implemented.
Every change to a production GB300 environment follows the same six steps. No change is silent.
Scope, justification, affected systems and risk assessment submitted.
Technical and security review; classified Standard, Significant or Emergency.
Formal sign-off per risk tier; emergency changes follow an expedited, documented path.
Executed in the approved window with the rollback procedure confirmed before start.
Verified against success criteria; security posture confirmed unchanged.
Record closed with outcomes; deviations captured and reviewed.
CambridgeNexus keeps an annual resilience testing calendar across all contracted environments. Every exercise produces observations, measurements, corrections and a scheduled retest.
Operational and tabletop scenarios: loss of management access, network event, cooling or power scenario, cybersecurity incident.
Technical recovery exercises for the deployed architecture: recovery procedures, escalation paths, vendor coordination.
Full DR and BC exercise with executive review, lessons learned integrated, plan refreshed.
You never have to work out whether an incident belongs to NVIDIA, the OEM, the network provider or the data center. CambridgeNexus Mission Control, staffed 24x7, orchestrates the response and escalates by impact, on two parallel tracks: technical resolution (Mission Control, Technical Incident Commander, external ecosystem, executive) and customer communication (your technical lead, your PMO, your executive sponsor).
Status (investigating, identified, monitoring, resolved), context, actions, next milestone, next update time. No speculation, no silence.
Receipt is confirmed and an owner assigned; technical and customer channels are opened.
Recovery validated, production confirmed, root cause and corrective actions documented.
After gate seven: all 72 GPUs validated, OEM diagnostic access closed, credentials rotated, your technical lead and PMO signed off on it, monitoring live and the contracted service levels active. Power on is gate one, production is gate seven.
Yes for B300: NVIDIA B300 systems go through the same CambridgeNexus readiness gates and seven operating layers as GB300 NVL72 racks, and they are simpler to operate because they are air-cooled. Vera Rubin racks will follow the same CambridgeNexus 7-gate operational framework; their final configuration and acceptance procedures are confirmed with you before delivery. NVIDIA B300 systems
CambridgeNexus Mission Control, 24x7. One front door: we coordinate NVIDIA, the OEM, the network provider and the data center on your behalf and keep you updated on a fixed cadence.
CambridgeNexus Mission Control detects the fault, opens the case and coordinates the replacement under the OEM warranty. You get one owner and a fixed update cadence until the node is back in production. The escalation path and the named team
Yes. Your rack, its nodes and its network fabric are dedicated to you for the full term. After a repair or a reboot you return to the same hardware and the same fabric; nothing is reshuffled. See the GB300 NVL72 rack
A SEV-1 incident is taken by a CambridgeNexus Incident Commander who runs the response and keeps your technical lead updated until service is restored. Response times and service levels are set in your contract, because they depend on your deployment. See how CambridgeNexus runs the seven operating layers
Yes. Every gate on your rack is recorded in its Delivery Passport, from serial numbers to sign-offs, and the record is shared with your technical lead at acceptance.
Yes, on a published calendar: quarterly tabletop and operational scenarios, semiannual technical recovery exercises, and a full annual DR and BC exercise with executive review. See how CambridgeNexus runs the seven operating layers
Book a site review. Bring your security and operations leads; we show the evidence for every gate on a live rack.