Mission Control 24x7·Seven readiness gates per rack

How CambridgeNexus delivers and operates NVIDIA GB300 racks

Operational excellence, from factory to production

Secure by design, resilient by architecture, operated with accountability. Every rack passes seven documented gates before your first workload runs, and one team owns the operation after that: monitoring, incidents, changes, and recovery, 24x7.

Power on is gate one. Production is gate seven.

OEM engineers may need temporary diagnostic access during installation. CambridgeNexus closes that access, rotates every credential and validates every GPU before a rack or system is handed to you. OEM ready, customer ready and production ready are three different states, and each one is evidenced before the next begins.

The main metric we monitor is “time to productive compute,” the sooner you can trust the system with real work the better. Every gate below has a named owner. The same seven gates apply to NVIDIA GB300 NVL72 racks and to NVIDIA B300 systems; B300 is air-cooled, with no liquid cooling, so it is simpler to install and operate. Vera Rubin racks will follow the same 7-gate framework when they ship. See the seven operating layers behind it

Every GB300 rack passes seven controlled gates

No gate is assumed. Each one produces documented evidence before the next begins.
  1. 1

    Factory ready

    OEM validation, BOM and serial verification, firmware baseline, factory diagnostics.

  2. 2

    Site ready

    Power, and space confirmed. Liquid cooling and CDU checked. Network fabric and rack position set.

  3. 3

    Commissioned

    72-GPU health check, NVLink and NVSwitch verification, InfiniBand or RoCE fabric, NIC, storage and burn-in.

  4. 4

    Network ready

    North-south IP and routes, fabric validation, storage array network, customer connectivity.

  5. 5

    Secured

    Credentials rotated, PAM and MFA active, SSH hardened, security telemetry live.

  6. 6

    Customer accepted

    Functional validation, exceptions documented, technical and PMO sign-off.

  7. 7

    Production

    Monitoring active, SLA activated, Mission Control live, operational ownership transferred.

One rack, one digital chain of custody

The CambridgeNexus Delivery Passport is the authoritative record for each rack, from serial number to customer sign-off.

Identity

Rack ID and asset IDs, serial numbers, OEM configuration, customer assignment.

Commissioning

GPU and CPU health, firmware versions, burn-in results, fabric validation.

Security

Credential rotation, hardening status, vulnerability validation, privileged-access status.

Acceptance

Sign-offs from CambridgeNexus engineering, security and operations, and from your technical lead and PMO.

Security is a production gate

Zero-trust access is built into the architecture. No unmanaged privileged access: every session is identity-verified, purpose-authorized, time-limited and fully auditable.

See the CambridgeNexus compliance record

Identity

SSO, phishing-resistant MFA, role-based access and least privilege, enforced on every management plane.

Segmentation

BMC and out-of-band isolation, management plane separated from the GPU fabric, storage and customer environments.

Detection and response

Centralized telemetry with SIEM, XDR and NDR, defined incident classification and containment.

Every incident has a severity, an owner and a cadence

Four severity levels, each with a named lead and a communication cadence. Response times and service levels are set in your contract.

The four incident severity levels CambridgeNexus uses, their owner and their communication cadence
Severity Owner Example impact Communication cadence
SEV-1 Critical Incident Commander Production unavailable, major security event Continuous updates until service is restored
SEV-2 High Operations Lead Material degradation or loss of redundancy Frequent updates until resolved
SEV-3 Medium Support Engineering Limited or non-critical impairment Regular updates
SEV-4 Request Service Desk Information, change or service request Standard service desk workflow
See how CambridgeNexus runs compliance

A defined recovery lifecycle

Resilience covers four layers: infrastructure (power redundancy, liquid or air cooling, fabric, facility continuity), platform (configuration baseline, management services, RMA), data (backup, replication, access controls) and business continuity (incident command, customer communication, vendor coordination, alternate capacity). When a disruption occurs, the same seven steps run every time.
  1. STEP 01

    Detect

    Telemetry identifies the disruption and triggers classification.

  2. STEP 02

    Declare

    Severity set, incident command activated.

  3. STEP 03

    Contain

    Customers and unaffected infrastructure protected first.

  4. STEP 04

    Recover

    Infrastructure and services restored per contracted scope.

  5. STEP 05

    Validate

    Technical and security validation before release.

  6. STEP 06

    Release

    Customer production formally restored and confirmed.

  7. STEP 07

    Learn

    Root cause analysis and corrective actions documented and implemented.

Production changes are controlled, traceable and reversible

Every change to a production GB300 environment follows the same six steps. No change is silent.

Request

Scope, justification, affected systems and risk assessment submitted.

Review

Technical and security review; classified Standard, Significant or Emergency.

Approve

Formal sign-off per risk tier; emergency changes follow an expedited, documented path.

Implement

Executed in the approved window with the rollback procedure confirmed before start.

Validate

Verified against success criteria; security posture confirmed unchanged.

Close

Record closed with outcomes; deviations captured and reviewed.

A plan that is never tested is only a document

CambridgeNexus keeps an annual resilience testing calendar across all contracted environments. Every exercise produces observations, measurements, corrections and a scheduled retest.

Ask for the current test report under NDA

Quarterly

Operational and tabletop scenarios: loss of management access, network event, cooling or power scenario, cybersecurity incident.

Semiannual

Technical recovery exercises for the deployed architecture: recovery procedures, escalation paths, vendor coordination.

Annual

Full DR and BC exercise with executive review, lessons learned integrated, plan refreshed.

One front door for production operations

You never have to work out whether an incident belongs to NVIDIA, the OEM, the network provider or the data center. CambridgeNexus Mission Control, staffed 24x7, orchestrates the response and escalates by impact, on two parallel tracks: technical resolution (Mission Control, Technical Incident Commander, external ecosystem, executive) and customer communication (your technical lead, your PMO, your executive sponsor).

Every update, one format

Status (investigating, identified, monitoring, resolved), context, actions, next milestone, next update time. No speculation, no silence.

A bridge is opened

Receipt is confirmed and an owner assigned; technical and customer channels are opened.

Closed only after review

Recovery validated, production confirmed, root cause and corrective actions documented.

FAQ

After gate seven: all 72 GPUs validated, OEM diagnostic access closed, credentials rotated, your technical lead and PMO signed off on it, monitoring live and the contracted service levels active. Power on is gate one, production is gate seven.

Yes for B300: NVIDIA B300 systems go through the same CambridgeNexus readiness gates and seven operating layers as GB300 NVL72 racks, and they are simpler to operate because they are air-cooled. Vera Rubin racks will follow the same CambridgeNexus 7-gate operational framework; their final configuration and acceptance procedures are confirmed with you before delivery. NVIDIA B300 systems

CambridgeNexus Mission Control, 24x7. One front door: we coordinate NVIDIA, the OEM, the network provider and the data center on your behalf and keep you updated on a fixed cadence.

CambridgeNexus Mission Control detects the fault, opens the case and coordinates the replacement under the OEM warranty. You get one owner and a fixed update cadence until the node is back in production. The escalation path and the named team

Yes. Your rack, its nodes and its network fabric are dedicated to you for the full term. After a repair or a reboot you return to the same hardware and the same fabric; nothing is reshuffled. See the GB300 NVL72 rack

A SEV-1 incident is taken by a CambridgeNexus Incident Commander who runs the response and keeps your technical lead updated until service is restored. Response times and service levels are set in your contract, because they depend on your deployment. See how CambridgeNexus runs the seven operating layers

Yes. Every gate on your rack is recorded in its Delivery Passport, from serial numbers to sign-offs, and the record is shared with your technical lead at acceptance.

Yes, on a published calendar: quarterly tabletop and operational scenarios, semiannual technical recovery exercises, and a full annual DR and BC exercise with executive review. See how CambridgeNexus runs the seven operating layers