Tier III facilities live·NVIDIA GB300 racks installed
NVIDIA GB300 NVL72 Price & Availability
GB300 NVL72 price quoted to your requirement: rate, capacity, site, dates
Your NVIDIA GB300 NVL72 price is built for the actual deployment: rack count, contract term, booking timeline, downpayment, and single-site or multi-site delivery. One rate, all seven operating layers included, from a 350+ NVIDIA GB300 rack allocation. B300 systems and Vera Rubin racks (expected mid-2027) are quoted the same way.
CambridgeNexus does not publish list prices for GB300 NVL72 racks, B300 systems or Vera Rubin racks. No two deployments cost the same: pricing depends on rack count, contract term, start date, deposit structure, and whether you deploy at one site or several.
Each quote covers a bare-metal, single-tenant rack lease with all seven operating layers in one contract: power, cooling, networking, compute, orchestration, compliance and workload planning. Terms run from 6 months to 5+ years; deployment is 75-90 days from contract, or faster depending on rack availability.
Tell us these four, and we can quote. Nothing else moves the number.
From a single rack to multi-rack deployments, capacity is sized to your requirement within the 350+ allocation.
From 6 months to 5+ years. Longer commitments take priority on capacity.
When you need the racks live. Earlier reservations secure capacity within the allocation.
Every CambridgeNexus contract includes a down payment. Its size and structure are agreed at quote.
CambridgeNexus holds an allocation of 350+ GB300 NVL72 racks, owned and operated in-house, and leases from a single rack upward.
Capacity scales with your roadmap, not our inventory.
Terms from 6 months up to 5+ years. Longer commitments take priority on capacity.
NVIDIA GB300 racks are already manufactured and installed in our facilities.
Hardware (GB300 NVL72, B300 or Vera Rubin), rack count, term, workload, and one site or several.
We confirm configuration, site and dates.
Rate, capacity, site and committed dates in one document.
Because no two deployments cost the same. The rate depends on rack count, contract term, booking timeline, and downpayment, so a list price would be misleading. Tell us the scale and term, and CambridgeNexus managers will quote against your actual requirement.
Everything required to run the NVIDIA GB300 racks: power, cooling, networking, compute, orchestration, compliance, and workload planning: the seven layers CambridgeNexus operates, in one contract. There are no separate infrastructure line items. The seven operating layers
Yes, depending on rack availability and on the deployment shape. 75-90 days from contract is the standard commitment for a single site; when racks are available sooner, CambridgeNexus deploys sooner. Multi-site deployments are scheduled site by site and can take longer. Your timeline is confirmed at technical qualification. How a CambridgeNexus deployment runs
Yes. Terms run from 6 months to 5+ years, and longer commitments take priority on capacity within the 350+ NVIDIA GB300 rack allocation.
Once rack count, term and workload are confirmed at technical qualification, CambridgeNexus returns a quote with rate, capacity, site and committed dates.
No. CambridgeNexus leases whole racks under contract, and trial capacity on GB300 NVL72 is not offered by any operator in this market. Instead, technical qualification confirms configuration, site and dates before you sign, and acceptance criteria are written into the contract. The readiness gates before acceptance
Tell us the rack count, the term, location, and your workload requirements. We'll come back with the deployment plan: capacity, site, and dates.
A technical conversation, from the first call